CALL FOR BIDS
PROJECT IDENTIFICATION: Sealed proposals will be received for:
2010 Deferred Maintenance for: Carver Elementary School Renovation 2680 Upper Afton Road Maplewood, MN 55119
in accordance with Construction Documents prepared by DLR Group, 520 Nicollet Mall, Suite 200, Minneapolis, MN 55402.
PROJECT DESCRIPTION: Bid package scope includes renovation of the toilet rooms and boiler room.
BASIS OF BIDS: Multiple Prime Bids will be received for labor and materials as outlined in the Bid Division Descriptions as described in Section 01 1215.
BID DATE AND LOCATION: Sealed bids will be received at Independent School District 622, Attention: Purchasing Department, 2520 12th Avenue East, North St. Paul, MN 55109, then publicly opened and read aloud. Bids will be received until 2:00 p.m. local time, on December 10, 2009.
BID SECURITY: Each bid shall be accompanied by Bid Security in form of certified check, cashier's check or bid bond in amount of five (5) percent of Base Bid submitted, made payable to Owner, as guarantee that Bidder will, if awarded, enter into Contract in accordance with Contract Documents and submitted Bid.
EXAMINATION OF DOCUMENTS: Drawings, Project Manual, and other Contract Documents may be examined at Offices of Construction Manager, Architect and at following locations:
Minneapolis Builders Exchange 1123 Glenwood Avenue Minneapolis, MN 55405 Telephone: 612-381-2620
McGraw-Hill 1401 Glenwood Avenue Minneapolis, MN 55405 Telephone: 612-381-2290
St. Paul Builders Exchange 445 Farrington Street St. Paul, MN 55103 Telephone: 651-224-7545
Reed Construction Document Processing 30 Technology Parkway South, Suite 500 Norcross, GA 30092-2912 Telephone: 800-424-3996
MEDA/IsqFt Planroom c/o Franz Reprographics, Inc. Attn: Evan Duncan 2781 Freeway Blvd. #100 Brooklyn Center, MN 55430 Telephone: 763-503-9335
PROCUREMENT OF DOCUMENTS: Prime Bidders may secure for no cost or deposit electronic Bidding and Contract Documents by downloading from www.franzrepro.com; contact Franz Reprographics, 2781 Freeway Boulevard, Brooklyn Center, MN 55430, phone 763-503-3401. CDs are available from Franz Reprographics for $20.00/each plus shipping. Printed sets are available from Franz Reprographics for a deposit of $250.00 per set, and a non-refundable shipping fee of $25.00 per set. Deposit will be refunded if documents are returned to Franz Reprographics in good condition, within 10 days after Bid Opening.
TIME OF COMPLETION: Owner requires Work to be substantially complete on or before August 20, 2010 and fully complete before August 27, 2010 and in accordance with the contract documents. Bids shall reflect all costs necessary to meet this schedule requirement.
PERFORMANCE AND PAYMENT BONDS: Contractor shall provide Performance Bond and Labor and Material Payment Bond in the amount of 100 percent of the Contract Sum.
OWNER'S RIGHT TO REJECT BIDS: Owner reserves the right to reject a Bid which is in any way incomplete or irregular or to waive informalities or irregularities in a Bid received, and accept a Bid, which in the Owner's judgment is in the Owner's best interests.
PROJECT LABOR AGREEMENT: Each contractor and subcontractor, having submitted a bid on this project certifies that it is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the project. In the interests of such harmony and the long-term supply of skilled manpower, each successful contractor and any and all levels of subcontractors, as a condition of being awarded a contract or subcontract, will agree to abide by the provisions of Project Labor Agreement as executed by and between Owner, Kraus-Anderson® Construction Company (Construction Manager for project) and the St. Paul Building and Construction Trades Council and its affiliated local unions, and will be bound by the provisions of that agreement in the same manner as any other provision of the Contract. A copy of the agreement is available for inspection at the office of the Construction Manager, Kraus-Anderson® Construction Company, 8625 Rendova Street N.E., Circle Pines, Minnesota 55014, and is included by reference in these Contract Documents as fully as if herein set forth.
EXAMINATION OF DOCUMENTS AND SITE:
Examination of Documents: Bidders shall carefully examine entire contents of Contract Documents prepared for the Work to become thoroughly familiar with all requirements.
Pre-Bid Conference: A Pre-Bid Conference will be held on November 18, 2009 at 9:00 a.m. at Carver Elementary School, 2680 Upper Afton Road, Maplewood, MN 55119.
Examination of the Site: Bidders shall make arrangements with the Construction Manager to visit the project site to obtain first-hand knowledge of existing conditions, including existing utilities and services, obstacles which may be encountered and all other conditions relative to the Work to be performed.
Additional Compensation: Contractors shall not receive extra payments for conditions which can be determined by examining the site and the Contract Documents.
Bids requested by: Independent School District 622
Publish: Beginning November 4, 2009 through Bid Date on: www.isd622.org
Independent School District #622 2520 12th Avenue East North St. Paul, MN 55109
CALL FOR BIDS
PROJECT IDENTIFICATION: Sealed proposals will be received for:
2010 Deferred Maintenance for: Richardson Elementary School Renovation 2615 First Street North North St. Paul, MN 55109
in accordance with Construction Documents prepared by DLR Group, 520 Nicollet Mall, Suite 200, Minneapolis, MN 55402.
PROJECT DESCRIPTION: Bid package scope includes renovation of the toilet rooms and boiler room.
BASIS OF BIDS: Multiple Prime Bids will be received for labor and materials as outlined in the Bid Division Descriptions as described in Section 01 1215.
BID DATE AND LOCATION: Sealed bids will be received at Independent School District 622, Attention: Purchasing Department, 2520 12th Avenue East, North St. Paul, MN 55109, then publicly opened and read aloud. Bids will be received until 3:00 p.m. local time, on December 10, 2009.
BID SECURITY: Each bid shall be accompanied by Bid Security in form of certified check, cashier's check or bid bond in amount of five (5) percent of Base Bid submitted, made payable to Owner, as guarantee that Bidder will, if awarded, enter into Contract in accordance with Contract Documents and submitted Bid.
EXAMINATION OF DOCUMENTS: Drawings, Project Manual, and other Contract Documents may be examined at Offices of Construction Manager, Architect and at following locations:
Minneapolis Builders Exchange 1123 Glenwood Avenue Minneapolis, MN 55405 Telephone: 612-381-2620
McGraw-Hill 1401 Glenwood Avenue Minneapolis, MN 55405 Telephone: 612-381-2290
St. Paul Builders Exchange 445 Farrington Street St. Paul, MN 55103 Telephone: 651-224-7545
Reed Construction Document Processing 30 Technology Parkway South, Suite 500 Norcross, GA 30092-2912 Telephone: 800-424-3996
MEDA/IsqFt Planroom c/o Franz Reprographics, Inc. Attn: Evan Duncan 2781 Freeway Blvd. #100 Brooklyn Center, MN 55430 Telephone: 763-503-9335
PROCUREMENT OF DOCUMENTS: Prime Bidders may secure for no cost or deposit electronic Bidding and Contract Documents by downloading from www.franzrepro.com; contact Franz Reprographics, 2781 Freeway Boulevard, Brooklyn Center, MN 55430, phone 763-503-3401. CDs are available from Franz Reprographics for $20.00/each plus shipping. Printed sets are available from Franz Reprographics for a deposit of $250.00 per set, and a non-refundable shipping fee of $25.00 per set. Deposit will be refunded if documents are returned to Franz Reprographics in good condition, within 10 days after Bid Opening.
TIME OF COMPLETION: Owner requires Work to be substantially complete on or before August 20, 2010 and fully complete before August 27, 2010 and in accordance with the contract documents. Bids shall reflect all costs necessary to meet this schedule requirement.
PERFORMANCE AND PAYMENT BONDS: Contractor shall provide Performance Bond and Labor and Material Payment Bond in the amount of 100 percent of the Contract Sum.
OWNER'S RIGHT TO REJECT BIDS: Owner reserves the right to reject a Bid which is in any way incomplete or irregular or to waive informalities or irregularities in a Bid received, and accept a Bid, which in the Owner's judgment is in the Owner's best interests.
PROJECT LABOR AGREEMENT: Each contractor and subcontractor, having submitted a bid on this project certifies that it is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the project. In the interests of such harmony and the long-term supply of skilled manpower, each successful contractor and any and all levels of subcontractors, as a condition of being awarded a contract or subcontract, will agree to abide by the provisions of Project Labor Agreement as executed by and between Owner, Kraus-Anderson® Construction Company (Construction Manager for project) and the St. Paul Building and Construction Trades Council and its affiliated local unions, and will be bound by the provisions of that agreement in the same manner as any other provision of the Contract. A copy of the agreement is available for inspection at the office of the Construction Manager, Kraus-Anderson® Construction Company, 8625 Rendova Street N.E., Circle Pines, Minnesota 55014, and is included by reference in these Contract Documents as fully as if herein set forth.
EXAMINATION OF DOCUMENTS AND SITE:
Examination of Documents: Bidders shall carefully examine entire contents of Contract Documents prepared for the Work to become thoroughly familiar with all requirements.
Pre-Bid Conference: A Pre-Bid Conference will be held on November 18, 2009 at 10:30 a.m. at Richardson Elementary School, 2615 First Street North, North St. Paul, MN 55109.
Examination of the Site: Bidders shall make arrangements with the Construction Manager to visit the project site to obtain first-hand knowledge of existing conditions, including existing utilities and services, obstacles which may be encountered and all other conditions relative to the Work to be performed.
Additional Compensation: Contractors shall not receive extra payments for conditions which can be determined by examining the site and the Contract Documents.
Bids requested by: Independent School District 622
Publish: Beginning November 4, 2009 through Bid Date on: www.isd622.org
Independent School District #622 2520 12th Avenue East North St. Paul, MN 55109
CALL FOR BIDS
PROJECT IDENTIFICATION: Sealed proposals will be received for:
2010 Deferred Maintenance for: Webster Elementary School Renovation 2170 East 7th Avenue North St. Paul, MN 55109
in accordance with Construction Documents prepared by DLR Group, 520 Nicollet Mall, Suite 200, Minneapolis, MN 55402.
PROJECT DESCRIPTION: Bid package scope includes renovation of the site, classrooms, office and boiler room.
BASIS OF BIDS: Multiple Prime Bids will be received for labor and materials as outlined in the Bid Division Descriptions as described in Section 01 1215.
BID DATE AND LOCATION: Sealed bids will be received at Independent School District 622, Attention: Purchasing Department, 2520 12th Avenue East, North St. Paul, MN 55109, then publicly opened and read aloud. Bids will be received until 2:00 p.m. local time, on December 8, 2009.
BID SECURITY: Each bid shall be accompanied by Bid Security in form of certified check, cashier's check or bid bond in amount of five (5) percent of Base Bid submitted, made payable to Owner, as guarantee that Bidder will, if awarded, enter into Contract in accordance with Contract Documents and submitted Bid.
EXAMINATION OF DOCUMENTS: Drawings, Project Manual, and other Contract Documents may be examined at Offices of Construction Manager, Architect and at following locations:
Minneapolis Builders Exchange 1123 Glenwood Avenue Minneapolis, MN 55405 Telephone: 612-381-2620
McGraw-Hill 1401 Glenwood Avenue Minneapolis, MN 55405 Telephone: 612-381-2290
St. Paul Builders Exchange 445 Farrington Street St. Paul, MN 55103 Telephone: 651-224-7545
Reed Construction Document Processing 30 Technology Parkway South, Suite 500 Norcross, GA 30092-2912 Telephone: 800-424-3996
MEDA/IsqFt Planroom c/o Franz Reprographics, Inc. Attn: Evan Duncan 2781 Freeway Blvd. #100 Brooklyn Center, MN 55430 Telephone: 763-503-9335
PROCUREMENT OF DOCUMENTS: Prime Bidders may secure for no cost or deposit electronic Bidding and Contract Documents by downloading from www.franzrepro.com; contact Franz Reprographics, 2781 Freeway Boulevard, Brooklyn Center, MN 55430, phone 763-503-3401. CDs are available from Franz Reprographics for $20.00/each plus shipping. Printed sets are available from Franz Reprographics for a deposit of $250.00 per set, and a non-refundable shipping fee of $25.00 per set. Deposit will be refunded if documents are returned to Franz Reprographics in good condition, within 10 days after Bid Opening.
TIME OF COMPLETION: Owner requires Work to be substantially complete on or before August 20, 2010 and fully complete before August 27, 2010 and in accordance with the contract documents. Bids shall reflect all costs necessary to meet this schedule requirement.
PERFORMANCE AND PAYMENT BONDS: Contractor shall provide Performance Bond and Labor and Material Payment Bond in the amount of 100 percent of the Contract Sum.
OWNER'S RIGHT TO REJECT BIDS: Owner reserves the right to reject a Bid which is in any way incomplete or irregular or to waive informalities or irregularities in a Bid received, and accept a Bid, which in the Owner's judgment is in the Owner's best interests.
PROJECT LABOR AGREEMENT: Each contractor and subcontractor, having submitted a bid on this project certifies that it is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the project. In the interests of such harmony and the long-term supply of skilled manpower, each successful contractor and any and all levels of subcontractors, as a condition of being awarded a contract or subcontract, will agree to abide by the provisions of Project Labor Agreement as executed by and between Owner, Kraus-Anderson® Construction Company (Construction Manager for project) and the St. Paul Building and Construction Trades Council and its affiliated local unions, and will be bound by the provisions of that agreement in the same manner as any other provision of the Contract. A copy of the agreement is available for inspection at the office of the Construction Manager, Kraus-Anderson® Construction Company, 8625 Rendova Street N.E., Circle Pines, Minnesota 55014, and is included by reference in these Contract Documents as fully as if herein set forth.
EXAMINATION OF DOCUMENTS AND SITE:
Examination of Documents: Bidders shall carefully examine entire contents of Contract Documents prepared for the Work to become thoroughly familiar with all requirements.
Pre-Bid Conference: A Pre-Bid Conference will be held on November 18, 2009 at 1:00 p.m. at Webster Elementary School, 2170 East 7th Avenue, North St. Paul, MN 55109.
Examination of the Site: Bidders shall make arrangements with the Construction Manager to visit the project site to obtain first-hand knowledge of existing conditions, including existing utilities and services, obstacles which may be encountered and all other conditions relative to the Work to be performed.
Additional Compensation: Contractors shall not receive extra payments for conditions which can be determined by examining the site and the Contract Documents.
Bids requested by: Independent School District 622
Publish: Beginning November 4, 2009 through Bid Date on: www.isd622.org
|